The application of Last Planner System in Construction Design > Editions

by Matteo Cremona

{ [ THE APPLICATION OF LAST PLANNER SYSTEM IN CONSTRUCTION DESIGN ] } Cremona Matteo ( AUTHOR ) Dec-20-2013 Paperback
Published by LAP Lambert Academic Publishing
Paperback, 0 pages
Author(s):
ASIN:
B00Q8CGMRY
Average rating:
0.0 (0 ratings)
Rate this book
Clear rating
The application of Last Planner System in Construction Design: Enhancing Collaboration and Decision-Making
Published December 20th 2013 by LAP LAMBERT Academic Publishing
Paperback, 132 pages
Author(s):
ASIN:
B0F26TMHHZ
Edition language:
English
Average rating:
0.0 (0 ratings)
Rate this book
Clear rating
The application of Last Planner System in Construction Design: Enhancing Collaboration and Decision-Making
Published December 20th 2013 by LAP LAMBERT Academic Publishing
Paperback, 132 pages
Author(s):
ISBN:
9783659507106 (ISBN10: 3659507105)
ASIN:
3659507105
Edition language:
English
Average rating:
0.0 (0 ratings)
Rate this book
Clear rating

per page